This is our "almost" finished church building. The following still needs to be done: (1) painting of the stage wall, (2) completion of the church office/stockroom at the rear, (3) painting of the posts with varnish, (4) construction of comfort room, (5) leveling of the ground around the building perimeter, (6) ceiling of the church office/stockroom, and (7) treat ground against termites.
Total expenses have reached P37,405.00. We have tried to raise an additional P7,000.00 and two donors have responded with P2,000.00 leaving us with just P5,000.00 left to raise. If you have the heart to help us with this, please let us know as soon as you can. Thanks and God bless.
No comments:
Post a Comment